The only realistic departure for Yerevan. Single runway 08/26 at 3,850 m by 56 m with ILS CAT II on runway 08, allowing operations to a 30 m ceiling and 300 m visibility, at 865 m field elevation. Taxiway A was rebuilt and returned to service in 2025 after decades out of use, which the operator expects to raise movement capacity by about 35 percent. Traffic was 5,615,789 passengers in 2025.