- Runway
- 2,601 m
- Operating hours
- n.a. (no published H24 status found); the runway is equipped with an instrument landing system, runway lights and approach lighting and is capable of night operations and low-visibility landings
- Best for
- Light · Midsize · Super-mid · Heavy
Single asphalt-concrete runway 09/27, 2,601 m by 45 m, oriented 093.1/273.1 degrees, shared with Antonio Bautista Air Base. The 13,000 sq m two-level terminal opened for commercial operations on 4 May 2017 with an annual capacity of 2 million passengers, six apron bays and an apron designed to take A330, A350 and 787 aircraft. Traffic reached 1,907,291 passengers in 2024 and 2,020,527 in 2025. Operator-level CAAP data for CY2024 show 9,828 aircraft movements at Puerto Princesa across all listed carriers. There is no dedicated FBO or private-jet terminal listed for PPS in the Business Air News airport handbook; Universal Aviation lists RPVP among Philippine airports it can support for GA traffic. Hangar area, IS-BAO or IS-BAH certification, curfew and slot rules: n.a.